Conversion of 270 m LNG Carrier with 127k m3 capacity to FSU.
Complete basic and class drawings were prepared with below scope:
- LNG System design
- LNG Flow analysis, BoG calculation and pipe stress analysis
- Deck fitting installation like QRH, additional mooring fittings.
-Replacement of existing cargo pump with feed pump.
- Manifold modification for continuous discharge of liquid, STS operation.
- Modification to electrical system to run on shore based power.