Scope of Work
- New Mooring Platform Design
- 4-Point Mooring System– mooring analysis, winch platform, layout, foundation design.
- 50-ton A-Frame– feasibility, Structural design (FEM) & plans.
- 18-T telescopic Crane– feasibility, Structural design (FEM) & plans.
- Diving Equipment– Wet bell, DDC container and Workshop.
- Misc. equipment– Stern roller, Side roller, Pipe Guard.
- Slop Tank – Structural modifications and P&IDs.
- Machinery – Schematics & arrangements.
- Electrical Load Calculation & Single Line Diagram.