- Scope includes study and modify existing mooring arrangement at the pier.
- Mooring analysis was done considering tide variation, dominant weather to get the forces acting on the mooring lines, vessel excursion etc.
- Based on mooring analysis few more mooring lines were added to distribute the line tension.